R048 is a Stepford Connect route that runs from St Helens Bridge to Airport Terminal 2. This route is 6.80 miles (10.94 kilometres) long and takes approximately 16 minutes to complete. This route costs 450 Points.
It was introduced along with R047 in Version 1.10.7.
Route
History
2023
- 2 April - Version 1.10.7
- R048 added.
- St Helens Bridge <> Airport Terminal 2
- Headcode: 2Ixx / 2Xxx
- Route type: Stepford Local
- Cost: 450 Points
- Spawn points: Coxly Station Siding, Coxly Bypass Siding, Benton Depot & Farleigh Depot (Road 11 & 17)
- Calling at: St Helens Bridge, Bodin, Coxly, Benton, Benton Bridge, Stepford Airport Parkway, Stepford Airport Central & Airport Terminal 2
- All Stepford Connect trains can run on this route.
2025
- 11 May - Version 2.2
- Route type: Stepford Local → Airport Connect
2026
- 10 January - Version 2.3
- New spawn point: Stoke Milton Carriage Siding (WB)
Trivia
- This is one of the three non-AirLink routes that stop at Airport Terminal 2, the others being
R017 and
R046.
| ||||||||||||||||
| ||||||||||||||||